Missions Blog


Jun 4

Barrera Home Renovation Mission Update #2 – Pressing Onward

This just in from Ian in Cheyenne, working with the DSC team of 7 working on the Barreras home:

Aside from a few minor repairs that will happen later, the major demolition is done. Now to put it all back together.

Today’s events:

  • grout bathroom tile floor
  • repair shower plumbing
  • hot water works which is awesome
  • Set new toilet. Install new tile in kitchen
  • sand the original wood floors
  • continue with installing new/refurbish doors and windows
  • continue with paint prep.

Thankful for the prayers!

Barrera home improvement

Whipping up something yummy in the Kitchen.